The arrival of a second batch of railway crossings

The country arrived from the Republic of China today, the second batch of trains belonging to the Sudan Railways. This completes the number that reached 30 abora out of a total of 34 abora. Engineer Walid Mahmoud Ahmed, director general of the Sudan Railways, said in a statement that the nine ferryboats that arrived, six (6) of which are travel gates, which pull goods between ports and cities and three others for maneuvering work inside the workshops and stations, expecting the third batch to arrive by the end of this year. Engineer Walid pointed out that the first batch of waterfalls arrived in the country last month from the Republic of China, and they numbered 21 laborers.

Related Articles

Back to top button